The project
A high variety of both self-perform and subcontract work: demolition of existing structures, strengthening of the elevated water tank foundation and a new water tank foundation.
Site power was upgraded with new duct bank conduit, along with above- and below-ground mechanical piping, a steel retrofit of the elevated tank and upgraded interior and exterior coatings.