DB-129.2 Transmission & Distribution
Underground vaults and duct banks for San Francisco’s high-voltage system — completed four months early.
The project
DB-129.2 was the middle contract of three successive Bay Corridor South Transmission & Distribution projects, providing electrical service for existing and future customers with large power needs.
In these design-build contracts, SFPUC’s Power Enterprise creates the fundamental design and leaves design completion and build-out to the contractor. Anvil Builders and GHD began design in May 2020, and construction started that November.
The work installed underground electrical vaults and duct banks for SFPUC’s high-voltage transmission and distribution system in the southeast corner of San Francisco. The project was completed four months early, in August 2021.
More power work.