Berkeley Marina
Replacement of Marina Docks D & E, including electrical work to support demolition of existing docks, procurement and installation new dock float system, gangway, concrete piling, utilities and ancillary work.
Underground electrical vaults and duct banks for high-voltage transmission and distribution, including design-build work for the SFPUC.
Replacement of Marina Docks D & E, including electrical work to support demolition of existing docks, procurement and installation new dock float system, gangway, concrete piling, utilities and ancillary work.
The project scope includes replacing the existing 1200A switchgear and distribution board with one (1) 3000A switchgear and two (2) sub-distribution electrical panels at the SamTrans South Base Maintenance Facility located in San Carlos.
Reliability improvements at Westside Pumpstation at San Francisco’s Ocean Beach is part of SFPUC’s Sewer System Improvement Program; the multi billion-dollar citywide program is committed to upgrading the combined sewer aging infrastructure.
The Westside Pump Station Reliability Improvements Project enhances the reliability and operational capacity of the facility to meet regulatory standards in San Francisco.
Send plans, specs and the bid date to our estimating team.
Send plans, specifications and the bid date to estimating@anvilbuilders.com, or call (415) 285-5000.
California #952883 (A, B, C10, C31, C-61/D49, C-61/D63, HAZ), plus Hawaii #CT-36150, Nevada #0086316 and #0086317, Oregon #OCL227102 and Washington #ANVILBI83300.
Yes. We are affiliated with Operators, Laborers, Carpenters, Pile Drivers and IBEW locals.
Yes. Subcontractors can join our directory for free so our Estimating Department has their information.
Owners, agencies and general contractors: send bid invitations and project inquiries to our estimating team.